What’s happening with our Bores?

 In Tee Booking Text and Ads

All Bores are now up and running. Power has been connected to the Bore on 11, the generator will run the Bore on 16 until power can be connected. The Solar array is pumping the Bore on 12.

Special thanks to Craig and the team @ Kennards Hire who have kindly supplied the generator on 16 until power is connected!